MOLD STRUCTURE

The seven systems of an injection mold: Gating system, guidance system, molding system, core pulling system, ejection system, cooling system and venting system.

  • Gating System:

Runner: Where the molten plastic flows through before reaching different cavities.Mold making

Sprue: Where the molten plastic flows through from the injection machine to the mold.

Gate: The last opening that allows the molten plastic to flow into the cavities.

Cold Slug Well: When the molten plastic flows in the sprue and runner, it will solidify due to heat transfer with the mold. The cold slug well is where the solidified material is stored before entering the cavities.

  • Guidance System:

In mold opening/closing process, mold displacement will occur due to manufacturing tolerances and installation tolerances. When the mold is closing, it is required that the mold is able to return to its original position. This is where guidance and location (i.e. mold guidance system) fit in. Molding System:

  • Molding System:

A closed space that consists of core, cavity and insert, etc. Ejection System: The ejector of the injection machine applies force on the press plate of the mold, which drives the ejector pins, ejector blocks and lifters etc. to push the product away from the core or the cavity, and thus enable smooth mold release.

  • Cooling System:

The mold itself is a large cooling system. To achieve a better cooling effect, one or more groups of cooling channels will be designed for the mold. Usually, the distance between the cooling channel and the product is twice the diameter of the channel. The coolant is not necessarily cold water – it can be water at 100 degrees Celsius depending on the mold temperature and sometimes it can also be hot oil.

MOLD STANARD

Mold Steel: ASSAB(Sweden), DAIDO(Japan),FINKL(America),AUBERT & DUVAL(France), mold making3Thyssen(Germany), LKM (China)

Mold Base: EMP, DME, HASCO, FUTABA, LKM.

Hot Runner: MOULD MASTER, SYNVENTIVE, HASCO, YUDO, INCOE

Standard Parts: DME, HASCO, LKM, STRACK, OPITZ

Texture: VDI 3400, Mold-tech, Yick Sang, Tanazawa etc

Software: Pro/Engineer, Solidworks, AutoCAD, Moldflow, CATIA, UG

ROGECT MANAGEMENT

Strong project management is our key to the success and quality of our products, All of our Project Engineersmold making22 not only have significant experience in tooling and injection molding but are also fluent in English. The Project Engineers are responsible for the follow up of tooling process, and for the timely reporting of the project’s progress to the customer.

Our mission is to provide:

1, On Time Delivery

2, An Assurance that our customer’s project is produced according to their order and standards

3, That communication is provided in a timely and clear manner

Prototype plastic injection molds produce real injection molded parts for functional testing. A prototype mold can produce the sameMold making4 type of parts as a production mold, but it is only warrantied for 10,000 parts due to its tooling materials. This is why the cost of a prototype mold is less than a production mold. It is less expensive, and it is warrantied for 10,000 parts, versus the lifetime warranty we provide on a production mold. VIVA Mold can quickly build prototype molds by using S50C or P20 soft tool steel.

PRODUCTION MOLD MAKING

Production injection molds are built to withstand higher volumes of plastic injection molding cycles. They are made with P20 steel or NK80 stainless steel, and typically last over 100,000 cycles. Moreover, we provide a lifetime warranty on production molds. As long as we continue to make your parts in our facility, we will maintain and repair the tool as needed at our cost. For low volume production, check out our prototype plastic injection molds.

Our mold making room is fully equipped to manufacture custom plastic molds, 90% of our injection molds are exported to European and north America, we are familiar with HASCO and DME standard after many years’ focus on export market. Averagely we can supply 30 sets of molds per month, lead time is around 25-35 days depends on the complexity of mold structure, mold bases supplies by LKM, mold steel and heat treatment with certificates apply to customers’ specification, maximum machining capacity 7.5ton, minimum precision 0.005mm.